Equipment Material Selection and Structural Optimization

  1. Xinhe utilizes reinforced screws and barrels.

    • Use 38CrMoAl nitrided steel screws with a surface nitrided layer ≥0.7mm thick and a hardness of 950-1020HV, significantly improving wear resistance.

    • Based on the processing characteristics of PVC, it is recommended to use a double-layer composite process (e.g., H13 steel substrate + tungsten carbide coating) in the feeding and melting sections to mitigate wear caused by high-filled calcium carbonate.

  2. Mold Design Improvement

    • The die lip clearance accuracy is controlled within ±0.05mm, and the die-forming section length should be 10%-30% of the product thickness to avoid melt retention and material decomposition.

    • The diverter cone angle must be <60° to prevent melt retention and thermal degradation of PVC.

    • Based on conventional molds, Xinhe has developed high-speed molds using three sections, such as high-speed molds for ceilings, high-speed molds for corner lines, and high-speed molds for PE pipes.

II. Precise Control of Process Parameters

  1. Temperature Gradient Management:

    • Feeding zone: 185-195°C (to ensure rapid vitrification of the powder), compression zone: 180-195°C, melting zone: 180-190°C, metering zone: 170-180°C (to avoid overheating and decomposition of the melt).

    • Die zone temperature: 190-210°C. Balance internal shear heat by adjusting brightness and extrusion pressure.

  • During long-term storage, apply anti-rust oil to the screw and hang it vertically. Seal the mold to prevent dust.

III. Intelligent Operation and Maintenance

  • Establish equipment operation KPIs (such as energy consumption and downtime frequency) and predict failures based on data.

  • Using a melt pump can reduce energy consumption by 15-30% and reduce the risk of melt degradation.

IV. Operating Specifications

  • Idle at low speed for ≤3 minutes during startup. Maintain low speed during the initial feeding phase and monitor ammeter fluctuations.

  • After a power outage, reheat to the set temperature and maintain temperature to avoid cold start damage.

Prev

Customized Vietnamese Plastic PVC Wood-Plastic Extrusion Production Practice

All Next

Jiangsu Xinhe Intelligent Equipment Co., Ltd. Achieves a Milestone: Massive Production Line Orders Successfully Shipped

Newsletter
Please Leave A Message With Us